nyc dot traffic standard drawings

nyc dot traffic standard drawingsnyc dot traffic standard drawings

The Emergency Street Opening Permit Number must be available at the site and presented to any governmental employee upon request. Cranes may require permits from DOB in addition to NYC DOT. There is one permit application form that covers Street Opening, Building Operations/Construction Activity, and Sidewalk Construction permits for non-governmental work. Effective 8/5/19 Closed until Further Notice ALL CLOSURES ARE CONFINED TO 15 FEET TO THE NEW EAST CURB LINE. ALL UTILITY COMPANIES SHALL BE REQUIRED TO INSTALL THEIR UTILITIES &/OR CONDUITS A MINIMUM OF 18 INCHES BELOW THE ROAD WAY SURFACE OR BASE WHICHEVER IS GREATER AS PER NYC DOT HIGHWAY RULES & REGULATIONS 2-11(11)(VII). Restoration Once work in the street has been completed, permittees are required to restore the street excavation to provide a smooth riding surface. Canopy permits are not transferable from person to person or from the location of original issue. Brooklyn.Forestry@parks.nyc.gov 619 Maintenance and Protection of Traffic - New York State Department IF RENEWED OR REISSUED, THIS PERMIT SHALL NOT BE PLACED ON HOLD. IF PERMIT ALLOWS WORK TO 6PM WEEKDAYS WORK MAY ALSO OCCUR FROM 6PM TO 11PM WEEKDAYS FOR THE PURPOSE OF DEP INSPECTION ONLY WITH INSPECTOR ON SITE. Key principles for effective coordination include: Provide Notice of Planned Street work at Earliest OpportunityThe basic principle of providing adequate advance notice is the greater the disruption, the longer the notice period needed. Once the canopy installation permit application has been reviewed and approved by the Permit Office, the permit is issued to the canopy installer or authorized agent, and canopy installation can begin. The Guarantee Period is considered to be three years on unprotected streets, and up to five years, but at no time less than three years, on protected (recently resurfaced or reconstructed) streets commencing on the restoration completion date. NYC DOT coordinates street opening and other construction on streets. A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. (NAME AT LEAST 2). It is essential to call New York 811 before digging anywhere, including sidewalks and soil. The stipulation text on a NYC DOT permit is the official text, with which a permittee must comply. (212) 442-7962 NYC DOT accepts and processes applications by mail for sidewalk repair performed by private homeowners. Incorrect Information on File If a permittees 24/7 phone number, address or other contact information is inaccurate or has changed without being updated, all future permit requests may be placed on hold until the information is updated. If a permit application includes permit requests to work on embargoed streets within 90 days prior to the start of the HE (November 16th), the permittee will be presented with a warning, during the application process, stating that such permit request(s) will be subject to the upcoming HE. NOVs carry a monetary fine and place the matter under the jurisdiction of the New York City Environmental Control Board (ECB). Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. Applicants have two options to acquire an emergency street opening/excavation permit. Costs: Shown for each pole or luminaire as a $ symbol, representing relative costs compared to the Standard Street Light (SSL), the Octagonal Pole. ON WEEKDAYS FROM 6AM TO 7PM MUST WORK BEHIND BARRIER WHILE MAINTAINING HALF SIDEWALK (MIN 5 FEET) FOR PEDESTRIANS AND NO USE OF ROADWAY. New York, NY 10023 WORK HOURS 9 PM TO 5 AM. They are accessible for the few years before September 2015, and for thelettings since September 2015. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. There is no fine associated with a Sidewalk Violation. HIQA may also inspect emergency street openings/excavations and utility access cover openings. THIS PERMIT REQUIRED AN ODV PERMIT WHICH MUST BE IN THE VEHICLE FOR INSPECTION BY A POLICE OFFICER AND OR AUTHORIZED GOVERNMENTAL EMPLOYEE UPON REQUEST. BUG Ratings DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. Department of Transportation. This category of permits applies to construction-related activities that take place within the street and are generally associated with construction work adjacent to the street. NYC DOT may revoke or refuse to renew a permit for any of the reasons listed below. Permit Review is the process by which NYC DOT reviews permit applications and supporting documentation and makes determinations regarding the issuance of permits and permit stipulations. The citys, For design criteria, technical information, finishes, and color specification, refer to DOTs Bureau of Traffic Operations, Division of Street Lighting specifications. Tel: 212-720-3480 Office hours: 8:30 AM-4:30 PM, Staten Island (718)786-8589 OR (718)786-8407, ONE SPEED REDUCER IS LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. THE CONTRACTOR IS RESTRICTED FROM REMOVING ANY STREET FURNITURE FOR THE INSTALLATION OF TREE PITS. Tel: 718-780-8280 All street lighting designs must be approved by DOT Street Lighting Engineering Unit. CONNECT WITH US. City Hall, 3rd Floor BLNRES-RESTORE AS PER SKETCH #5 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Canopy placement must be adequate for public safety and must be suitable to the circumstances of the proposed canopy location and not interfere with the public use of the sidewalk. Permits are available for various types of work, including Street Opening Permits, Building Operations/Construction Activity Permits, and Sidewalk Construction Permits. IF CURB LANE BECOMES A TRAVEL LANE THIS STIP DOES NOT APPLY. Kew Gardens, NY 11424 NYC DOT project locations, protected streets, and other maps are available online at the Department of Information Technology & Telecommunications (DoITT) NYCityMap website and the DOTMap portal. Although registration is a one-time process, registered applicants must keep all insurance and general information up to date, which must be done in person at the central Permit Office. If the insurance is not current, the request will be denied. Unauthorized removal of muni-meters is prohibited. FOR PROJECT COORDINATION PURPOSES, THE PERMITTEE MUST CONTACT THE RESIDENT ENGINEER FOR THE NYCT SECOND AVENUE SUBWAY PROJECT PRIOR TO COMMENCING WORK. COMPLY WITH DOT STANDARD #H1042C. NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. The second option is available for applicants who do not have the technology to use the above procedure. Fax: 718-596-2609, Central Office Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series). Typical treatments include removing vault roof near curb, filling flowable lifts, and breaking vault floor. ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. Keywords: Portable, Sign, Support, Temporary, Wooden, Keywords: Portable, Temporary, Rumble Strips, Keywords: Closure, Encroachment, Lane, Mowing,Shoulder, Special, For further information, call (212) 839-9435. City streets facilitate the movement of pedestrians, transit riders, motorists and cyclists as well as the delivery of goods and services throughout the city. The installation and repair of this infrastructure is crucial to maintaining and strengthening the city's competitive position in the global economy. NYC DOT authorization is required before installing a canopy over the sidewalk. If there is no hold, the permit is issued to the applicant after appropriate payment is received. CPO holds will typically be released by DDC if the proposed work does not interfere with its schedule. For Holds: (718) 222-7231 WORK SOUTHBOUND 9AM-6PM M-F AND 9AM-6PM SAT/SUN. A DOB-approved plan must be obtained and submitted to PEU with the application for a final approval and permit. (212) 839-2399 Office hours: 8:30 AM-3:30 PM. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City 2 HOURS BEFORE UNTIL 2 HOURS AFTER ALL YANKEE HOME GAMES ALL MOVEMENTS INTO AND OUT OF THE SITE ARE RESTRICTED ALONG EXTERIOR STREET. All other inquiries: (718) 222-7207 FOUR SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA.PRIOR TO BEGINING ANY WORK,TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. OCCUPY A MAXIMUM OF 12 FT OF ROADWAY FOR ASBESTOS REMOVAL ONLY BETWEEN THE HOURS OF 7PM - 6AM, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING CENTER MALL. (If the homeowner is using a contractor, the contractor must be registered with NYC DOT and must take out the permit.) Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. Plan Examination Unit 1932 Arthur Avenue, 5th Floor FOR ANY CAPITAL WORK INVOLVING CURB-TO- CURB RESURFACING OF THE STREET,PERMITTEE AND RESIDENT ENGINEER FOR THE SPONSORING AGENCY SHALL NOTIFY THE APPROPRIATE DOT BOROUGH ADMIN. PERMITTEE IS PARTICIPATING IN CORE DRILLING PILOT PROGRAM. Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. REQUIRES BUREAU OF BRIDGES APPROVAL PRIOR TO WORK. Permittees are responsible for maintaining the restoration for the duration of the "Guarantee Period" and must retain insurance for this purpose. Full Sidewalk | NYC Street Design Manual Fax: 718-286-3183, Staten Island Expanding on thesmall sampling of recommended plants listed in previous versions of the Street Design Manual, DOT is now introducing its Plant Finder tool, offering a broadened database of plants that have been successfully used within the public right-of-way. The Permit Bureau issues a number of different categories of construction-related permits for work on a street. Queens.Forestry@parks.nyc.gov One call to New York 811 provides for where gas (yellow), electric (red) and phone (orange) are located. BQE Central Workshops. WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. DO NOT PLACE ON MTA/NYCT ANTENNA POLES. If no changes are required, the permit will be released. NYC DOT registers permittees, and coordinates and issues permits for construction-related activity on streets. For Further Information: Upon completion of this action, the hold(s) will be released. Re-Dig (RED) hold In cases where an inspection has revealed a failed restoration and permittees have been told to redo the entire restoration, a RED hold will be placed. Additional information regarding embargo periods is provided in Chapter 3, Section 3.6.2. Winter holiday embargoThe winter holiday embargo typically starts in mid-November and lasts through January 2. Applicants have two options to acquire an EAN. 210 Joralemon Street, 8th Floor Fax: (718) 298-7075, Staten Island (part-time office) SUPERINTENDENT OF HIGHWAY OPERATIONS (ASHO) OFFICE & OCMC-STREETS IN WRITING NO LATER THAN 48-HOURS PRIOR TO COMPLETION OF PAVING. MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. Street excavations must be performed in accordance with Section 2-11 (e) of the Highway Rules. See, Utilize recycled content in paving materials. Bridge (BOB) hold Any planned work requiring a Building Operations/ Construction Activity Permit that may potentially be within 100 feet of a bridge structure will be placed on a Bridge hold. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. OFF-SITE STORAGE MUST BE PERMITTED SEPARATELY. Office hours: 8:30 AM-5:00 PM, Queens The Queens borough permit office is located in Queens Borough Hall. Special Treatment Projects (STP) hold Any permits issued to work in areas that have a special treatment such as Times Square, Madison Square, Herald Square and other pedestrian plaza areas are automatically placed on hold. CTDOT_Traffic_STD.zip Special and separate procedures govern emergency work: one for utility access covers (including those for "manholes," valve covers and grates) and one for street openings/excavations. A collection of manuals, specifications, and other publications relevant to the Office of Traffic Operations. NO NOISY WORK 10 PM TO 7 AM M-F, 10 PM FRIDAY TO 8 AM SATURDAY, 10 PM SATURDAY TO 9 AM SUNDAY AND 10 PM SUNDAY TO 7 AM MONDAY. 3. NYC DOT's HIQA unit inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. If the application and its supporting documentation are accepted, the OCMC Project Manager (PM) reviews the application and all associated documents and adds the permit stipulations to the permit application. COORDINATE WITH NYSDOT PRIOR TO WORK. APPROVAL FROM THE LANDMARK PRESERVATION COMMISSION IS REQUIRED BEFORE WORK COMMENCES. Contact information pertaining to the release of holds by NYC DOT can be found in Appendix C, NYC DOT Contact Information. The NYC Street Works Manual describes policies governing work on city streets, and presents procedures for notice, approval and execution of such work. 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. CONTRACTORS SHALL NOTIFY IN WRITING BY LETTER POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ALL PROPERTY OWNERS ON THE AFFECTED STREET SEGMENT A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE. BEVELED SAWCUT IN ROADWAY. As shown in the screen image, the pop-up for the "NYC DOT 10 year Capital Plan" layer features a project ID, title, and the fiscal year for which the project is planned, whereas the pop-up for "NYC DOT Protected Streets" includes street name and the date to which protected status extends. Listed in the table are the most commonly requested Building Operations/Construction Activity Permit types, which may be used when completing an application. NYC DOT's street reconstruction and resurfacing programs include nearly 6,000 miles of city streets. TWO HUNDRED TWENTY OF THE LABOR LAW, PAID TO THOSE SO EMPLOYED.

Sonicwall Tz400 End Of Life Date, Joel Thomas Bodybuilder Stats, Family Engagement Conference 2023, Lee And Tiffany Family, Super Dave Osborne Voice Problem, Articles N